Exam Number/Code: HP0-S24
Exam Name: Planning and Designing ProLiant Solutions for the Enterprise
For candidates making preparation for the HP HP0-S24 exam, what they most desire is to easily pass the HP0-S24 (Planning and Designing ProLiant Solutions for the Enterprise) exam. TestKing.cc HP0-S24 are collected and collated by experts of HP. With our HP0-S24 study materials, you can successfully take HP certification of HP0-S24 exam and go further on HP career path.

Study Tips
This product will provide you questions and answers carefully compiled and written by our experts. Try to understand the concepts behind the questions instead of cramming the questions.

1. Go through the entire document at least twice so that you make sure that you are not missing anything.
What is the recommended tool for configuring iLO 2 settings on new servers?
A. HP Systems Insight Manager (HP SIM)
B. ROM-Based Setup Utility (RBSU)
C. SmartStart
D. SmartStart Scripting Toolkit (SSST)
Answer: B

2. Which features are included with the HP Modular Cooling System? (Select three.)
A. hot-swappable components
B. height range from 14 to 47U
C. support for very high density hardware
D.perforated front and back doors
E. support for up to 35kW per rack
F. loading capacity up to 1500 pounds (680 kg)
Answer: A, C, E

3. In dual-core processor technologies, which components are duplicated within the single physical processor chip?
A. execution core and processor cache
B. processor cache and cache controller
C. execution core, processor cache, and cache controller
D. execution core, processor cache, cache controller, and bus interface
Answer: D

4. Which type of memory protects against multiple, non-correctable multi-bit errors with no performance degradation?
A. ECC memory
B. Online spare memory
C. Advanced ECC memory
D. Single-board mirrored memory
Answer: D

5. What are the benefits of using HP Insight Rapid Deployment software? (Select two.)
A. It automates server operating system deployments.
B. It provides out-of-the-box support for deployment of VMware ESX hosts.
C. It can be installed on systems running Microsoft Windows, Linux, or HP-UX.
D. It can suspend or resume monitoring of multiple systems at the same time.
E. It is part of HP SmartStart and is included in every ProLiant server package.
Answer: A, B

6. Which statements are true about the HP SmartStart Scripting Toolkit? (Select two.)
A. It provides an assisted and manual installation process.
B. It is delivered through a web download.
C. It supports all HP ProLiant DL, ML, and BL servers and selected legacy server models.
D. It is part of the HP Insight Suite for ProLiant Management CD pack.
E. It uses a graphical user interface that enables novice user setup.
Answer: BC

Donwload Free TestKing Braindumps – The Most Realistic Practice Questions and Answers, Help You Pass any Exams

7. What is a benefit of the HP Insight Control Environment for BladeSystem?
A. Licenses bundled with c-Class enclosures can be applied to ProLiant ML/DL/BL.
B. It provides unified virtual and physical server management.
C. It can be fully integrated with the HP Insight Rapid Deployment software.
D. It is a free plug-in for HP Systems Insight Manager (HP SIM).
Answer: B

8. Which HP tool can balance resources to provide optimal performance and service levels by migrating workloads from physical to virtual infrastructures, from virtual to physical, from third-party x86 servers to ProLiant servers, or from one Hypervisor type to another?
A. Insight Dynamics – VSE
B. Insight Control Environment
C. Insight Control Linux Edition
D. Insight Control Environment for BladeSystem
Answer: A

9. Which HP Insight Control Environment (HP ICE) components are supported on ProLiant c-Class server blades but not on Integrity c-Class server blades? (Select three.)
A. HP Insight Rapid Deployment software (RDP)
B. HP Vulnerability and Patch Management Pack (VPM)
C. HP Systems Insight Manager (HP SIM)
D. HP Insight Power Manager (IPM)
E. HP Insight Performance Manager
F. HP BladeSystem Integrated Manager
Answer: B, D, E

10. What can be imported into the HP System Management Homepage to increase security?
A. local server certificate
B. encrypted password file
C. Secure Shell (SSH) public key
D. 128-bit RC4 encryption license
Answer: A

11. When configuring the authorizations for the System Management Homepage (SMH) on a Linux server, what should the system manager do to allow access for the root user?
A. Create a password for root in SMH.
B. Add root to the administrators group in SMH.
C. Import the password file from Linux into SMH.
D. Enter the root username and password to log into SMH.
Answer: D

Up to the immediate present Test King HP HP0-064 certification

Tuesday, September 22nd, 2009

VUE/Prometric Code: HP0-064
Exam name:  HP BladeSystems C-Class Solutions 1

1. Which port on a BladeSystem c-Class enclosure serves as a service port for temporary connection to a PC?
A. USB port
B. serial connector
C. enclosure link-up port
D. enclosure link-down port
Answer: C

2. if you are installing a Gbe2c switch, how can the switch obtain an IP address remotely?
A. through a Telnet connection on any server with access to the internet
B. from a BOOTP server on the network, using the switches MAC address
C. through a VT100 terminal emulation session on any server on the network
D. through the switch browser-based interface (BBI) or command line interface (CLI)
Answer: B

3. In a BladeSystem c-Class enclosure, how are the interconnects connected to the device bays?
A. CAT5 cables
B. RJ-45 cables
C. 100-pin connectors
D. connections are hard-wired
Answer: D

4. Which statements describe the default role of the operator access level in an HP GbE2c switch for BladeSystem c-Class?(Select two).
A. An operator can reset ports or the entire switch
B. An operator can change user and administrator passwords
C. Operator-level access is the default on HP GbE2c switches
D. An operator can make permanent changes to the switch configuration
E. Any configuration changes an operator makes are undone by resetting the switch
Answer: A, E

5. You want to establish a connection to the switch through the Onboard Administrator. Your workstation has a terminal application installed and a null modem serial cable connected to the Onboard Administrator module, but you are unable to connect. What is the most probable cause of the error?
A. You have the wrong IP address
B. Another user is logged in to the switch
C. You can access the switch only through Advanced Web Tools
D. You can access the switch only through the Application program interface (API)
Answer: B

6. You are configuring the Ethernet interconnects for a customers system. The customer is deploying a solution that maintains a 1:1 ratio between servers and switch ports. Which solution will be most cost-effective for this customer?
A. Virtual Connect
B. Redundant GbE2c switches
C. HP Ethernet Pass-Thru Module
D. HP InfiniBand 4X DDR Switch Module
Answer: C

HP & Other hot certification exams: HP0-240 Exam ; 9A0-068 Exam ; E20-850 Exam ;  HP0-Y18 Exam ;  70-290 Exam

Download testking HP0-064 exam free resource

Tuesday, September 8th, 2009

Vendor: HP
Exam Code: HP0-064
Exam Name: HP BladeSystems C-Class Solutions 1

1. Which port on a BladeSystem c-Class enclosure serves as a service port for temporary connection to a PC?
A. USB port
B. serial connector
C. enclosure link-up port
D. enclosure link-down port
Answer: C

2. if you are installing a Gbe2c switch, how can the switch obtain an IP address remotely?
A. through a Telnet connection on any server with access to the internet
B. from a BOOTP server on the network, using the switches MAC address
C. through a VT100 terminal emulation session on any server on the network
D. through the switch browser-based interface (BBI) or command line interface (CLI)
Answer: B

3. In a BladeSystem c-Class enclosure, how are the interconnects connected to the device bays?
A. CAT5 cables
B. RJ-45 cables
C. 100-pin connectors
D. connections are hard-wired
Answer: D

4. Which statements describe the default role of the operator access level in an HP GbE2c switch for BladeSystem c-Class?(Select two).
A. An operator can reset ports or the entire switch
B. An operator can change user and administrator passwords
C. Operator-level access is the default on HP GbE2c switches
D. An operator can make permanent changes to the switch configuration
E. Any configuration changes an operator makes are undone by resetting the switch
Answer: A, E

5. You want to establish a connection to the switch through the Onboard Administrator. Your workstation has a terminal application installed and a null modem serial cable connected to the Onboard Administrator module, but you are unable to connect. What is the most probable cause of the error?
A. You have the wrong IP address
B. Another user is logged in to the switch
C. You can access the switch only through Advanced Web Tools
D. You can access the switch only through the Application program interface (API)
Answer: B

6. You are configuring the Ethernet interconnects for a customers system. The customer is deploying a solution that maintains a 1:1 ratio between servers and switch ports. Which solution will be most cost-effective for this customer?
A. Virtual Connect
B. Redundant GbE2c switches
C. HP Ethernet Pass-Thru Module
D. HP InfiniBand 4X DDR Switch Module
Answer: C